🔧 MEPCO Meter Relocation: Complete Process & Charges 2026
Whether you're renovating your home, building an extension, or need to move your electricity meter for safety reasons, MEPCO (Multan Electric Power Company) has an official process for meter relocation. This guide covers everything you need to know about shifting your meter legally, including costs, documents, and timeline.
⚠️ Important Warning
Moving your meter yourself or tampering with meter seals is illegal under the Electricity Act 1910. It can result in:
- Heavy fines (PKR 50,000+)
- Immediate disconnection
- Criminal case (FIR)
- Back-billing for estimated theft
Always go through the official MEPCO process.
When Should You Relocate Your Meter?
Common reasons for meter relocation include:
- Home Renovation: Building extension covers current meter location
- Boundary Wall Changes: New wall blocks meter access
- Safety Concerns: Meter is too low, exposed to rain, or at risk
- Access Issues: Meter readers cannot easily access for reading
- Construction: Need to shift to a different pole
- Security: Want meter at a more secure/visible location
- New Gate: Want meter near new entrance
Types of Meter Relocation
1. Same Pole Shifting (Simpler)
Moving the meter on the same property, connected to the same pole:
- Different location on boundary wall
- From outside to inside gate
- Different height on same wall
Cost: PKR 3,000 - 8,000
2. Different Pole Shifting (Complex)
Moving the meter to connect with a different pole or transformer:
- Significant distance from original location
- Requires new service cable
- May require pole installation
Cost: PKR 10,000 - 50,000 (depending on distance and material)
Step-by-Step Relocation Process
Step 1: Prepare Documents
Gather the following before visiting the MEPCO office:
- ✓ Latest Paid Electricity Bill (not older than 3 months)
- ✓ CNIC Copy of connection owner (front & back)
- ✓ Written Application stating:
- Reason for relocation
- Current meter location
- Desired new location
- ✓ Property Ownership Proof (if requested)
- ✓ Owner's NOC (if applicant is tenant)
Step 2: Submit Application
Visit your local MEPCO Sub-Division Office:
- Locate your SDO (Sub-Divisional Officer) office - check your bill for the sub-division name
- Submit your written application to the SDO
- Attach all required documents
- Get a receipt/tracking number for your application
Step 3: Site Verification
A MEPCO official (Line Superintendent or Assistant Lineman) will visit your premises to:
- Verify the current meter location
- Assess the proposed new location
- Check feasibility (pole distance, cable route)
- Ensure new location is safe and accessible for meter readers
- Estimate material requirements
Step 4: Demand Notice (Cost Estimate)
If approved, MEPCO issues a "Shifting Demand Notice" detailing costs:
| Cost Component | Estimated Amount |
|---|---|
| Processing Fee | PKR 1,500 - 3,000 |
| Service Cable (per meter) | PKR 150 - 300 |
| Labor Charges | PKR 1,000 - 3,000 |
| New Meter Box (if needed) | PKR 500 - 1,500 |
| Additional Material | Varies |
Step 5: Pay Demand Notice
- Download/collect the Demand Notice
- Pay at designated banks (NBP, MCB, HBL, ABL)
- Submit payment receipt to SDO office
Step 6: Meter Shifting Execution
After payment verification:
- MEPCO schedules the shifting work
- Technical team arrives at scheduled time
- Old location connection is removed
- Meter is installed at new location
- New seals are applied
- Connection is tested
Total Cost Estimates
| Relocation Type | Description | Estimated Cost |
|---|---|---|
| Same Wall (Minor) | Move a few feet on same wall | PKR 3,000 - 5,000 |
| Same Pole (Standard) | Different wall, same pole | PKR 5,000 - 10,000 |
| Different Pole (Near) | Adjacent pole, short distance | PKR 10,000 - 20,000 |
| Different Pole (Far) | Distant pole, long cable run | PKR 20,000 - 50,000+ |
| New Pole Required | New pole installation needed | PKR 50,000 - 100,000+ |
*Actual costs depend on current material rates and specific site conditions.
Timeline Expectations
| Stage | Duration |
|---|---|
| Application to Site Visit | 3-7 days |
| Site Visit to Demand Notice | 5-10 days |
| Payment to Execution | 7-15 days |
| Total Timeline | 2-4 weeks |
Tips for Smooth Relocation
- Plan ahead: Apply before starting construction to avoid delays
- Be specific: Clearly mark the new location when official visits
- Prepare the site: Have the new meter box location ready
- Clear dues: Ensure all past bills are paid before applying
- Follow up: Visit SDO office if there's no response in 7 days
- Get estimates: Ask for material estimate before approval
Frequently Asked Questions
How much does MEPCO meter relocation cost?
Costs vary based on distance and material. Processing fee is PKR 1,500-3,000. Standard shifting within same pole costs PKR 3,000-8,000. Shifting to a different pole may cost PKR 10,000-25,000 or more depending on cable length.
Can I move my electricity meter myself?
No, moving a meter yourself is illegal. Tampering with meter seals violates the Electricity Act 1910 and can result in heavy fines (PKR 50,000+), disconnection, and criminal charges. Always use the official MEPCO process.
How long does meter relocation take?
After paying the Demand Notice, relocation typically takes 7-15 working days. The entire process from application to completion takes 2-4 weeks depending on staff availability.
What documents are needed for meter relocation?
You need: latest paid electricity bill copy, CNIC copy of connection owner, written application explaining reason and new location, and property ownership proof if requested.
Can a tenant apply for meter relocation?
Yes, but a tenant needs an NOC (No Objection Certificate) from the property owner along with owner's CNIC copy before MEPCO will process the application.
Related Resources
- MEPCO New Connection Guide
- MEPCO Tariff Rates 2026
- MEPCO Bill via SMS Service
- Understanding Fixed Charges
- Check MEPCO Bill Online
📊 Check Your MEPCO Bill
Use our MEPCO Bill Checker to view your current bill and ensure all dues are cleared before applying for meter relocation.